FAIR TRANSACTIONS IN SUBCONTRACTING ACT
3195 · 2005-07-01
FAIR TRANSACTIONS IN SUBCONTRACTING ACT
Act No. 7488, Mar. 31, 2005
Act No. 3779, Dec. 31, 1984
Amended by Act No. 4198, Jan. 13, 1990
Act No. 4419, Dec. 14, 1991
Act No. 4514, Dec. 8, 1992
Act No. 4898, Jan. 5, 1995
Act No. 4860, Jan. 5, 1995
Act No. 5234, Dec. 30, 1996
Act No. 5386, Aug. 28, 1997
Act No. 5454, Dec. 13, 1997
Act No. 5507, Jan. 13, 1998
Act No. 5816, Feb. 5, 1999
Act No. 5756, Feb. 5, 1999
Act No. 6198, Jan. 21, 2000
Act No. 6893, May 29, 2003
Act No. 7107, Jan. 20, 2004
Act No. 7315, Dec. 31, 2004
Act No. 7488, Mar. 31, 2005
법령보기 화면
Article 1 (Purpose)
The purpose of this Act is to contribute to the sound development of the national economy by establishing a fair order for subcontracting so that the a prime contractor and a subcontractor may attain a complementary and harmonious growth on an equal status.
법령보기 화면
Article 2 (Definitions)
(1)
For the purpose of this Act, the term "subcontract transactions" means that a prime contractor entrusts a subcontractor with the manufacture (including the processing; hereinafter the same shall apply), repair, construction, or service, or a prime contractor re-entrusts a subcontractor with what have been entrusted to the prime contractor by another entrepreneur for the manufacture, repair, construction, or service, which is the act that the subcontractor entrusted therewith (hereinafter referred to as the "entrustment with the manufacture, etc.") conducts the manufacture, repair, work execution, or service performance for what the subcontractor has been entrusted with (hereinafter referred to as the "objects, etc."), and supply, deliver or provide to the prime contractor (hereinafter referred to as the "supply, etc.") and receives the price thereof (hereinafter referred to as the "subcontract price").
<Amended by Act No. 7488, Mar. 31, 2005>
(2)
For the purpose of this Act, the term "prime contractor" means any person who fall under one of the following subparagraphs:
<Amended by Act No. 4419, Dec. 14, 1991; Act No. 4514, Dec. 8, 1992; Act No. 4860, Jan. 5, 1995; Act No. 5234, Dec. 30, 1996; Act No. 5816, Feb. 5, 1999>
1.
An entrepreneur other than a small and medium enterprise owner (the persons referred to in the provisions of
Article 2 (1) of the Framework Act on Small and Medium Enterprises
, including the small and medium enterprise cooperatives prescribed by the
Small and Medium Enterprise Cooperatives Act
; hereinafter the same shall apply), who entrusts a small and medium enterprise owner with the manufacture, etc.;
2.
A small and medium enterprise owner whose annual sales in the immediately preceding business year (in case of a trade which is subject to the appraisal of capacity for executing works under the related Acts, it refers to the total amount thereof in the year concerned, and in the absence of the annual sales or the amount of appraisal of capacity for executing works, it refers to the total assets; hereafter in this subparagraph, the same shall apply), or whose number of ordinary employees exceeds twice that of other small and medium enterprise owners who are entrusted with the manufacture, etc., and who entrusts other small and medium enterprise owner with the manufacture, etc., except the small and medium enterprise owner whose annual sales are equal to the amount prescribed by the Presidential Decree; and
3.
and 4. Deleted.
<by Act No. 4860, Jan. 5, 1995>
(3)
For the purpose of this Act, the term "subcontractor" means a small and medium enterprise owner who is entrusted with the manufacture, etc. by the prime contractor as referred to in each subparagraph of paragraph (2) of this Article.
<Amended by Act No. 4860, Jan. 5, 1995>
(4)
If an entrepreneur entrusts an affiliated company as prescribed in subparagraph 3 of
Article 2 of the Monopoly Regulation and Fair Trade Act
with the manufacture, etc., and the affiliated company re-entrusts a third person with the whole or considerable part of the manufacture, repair, work execution, or service performance acts, and even though the affiliated company does not fall under any of the subparagraphs of paragraph (2), if the third person falls under the provisons of paragraph (3) on the assumption that he is entrusted with the manufacture, etc. directly by the entrepreneur who entrusts it to the affiliated company, the affiliated company and the third person shall be considered as the prime contractor and the subcontractor as prescribed by this Act, respectively.
<Amended by Act No. 4514, Dec. 8, 1992; Act No. 4860, Jan. 5, 1995; Act No. 5234, Dec. 30, 1996; Act No. 7488, Mar. 31, 2005>
(5)
If a company belonging to an enterprise group restricted on mutual contribution as prescribed in
Article 9 (1) of the Monopoly Regulation and Fair Trade Act
entrusts or is entrusted with the manufacture, etc., it shall be governed by the provisions which fall under each of the following subparagraphs:
<Newly Inserted by Act No. 4514, Dec. 8, 1992; Act No. 4860, Jan. 5, 1995; Act No. 5234, Dec. 30, 1996; Act No. 7107, Jan. 20, 2004>
1.
Even though the company which entrusts the manufacture, etc. does not fall under any subparagraph of this
Article 2
(2), it shall be considered as the prime contractor as prescribed by this Act; and
2.
Even though the company which is entrusted with the manufacture, etc., falls under paragraph (3) of this Article, it shall not be considered as the subcontractor prescribed by this Act.
(6)
For the purpose of this Act, the term "entrustment with the manufacture" means an entrepreneur engaged in such business for profit which falls under one of the following subparagraphs, entrusts another entrepreneur with the manufacture of goods resulting from such business. In this case, the scope of goods resulting from such business shall be prescribed and a public notice thereof shall be made by the Fair Trade Commission:
<Amended by Act No. 4860, Jan. 5, 1995; Act No. 5234, Dec. 30, 1996; Act No. 6198, Jan. 21, 2000; Act No. 7488, Jan. 31, 2005>
1.
Manufacture of goods;
2.
Sale of goods;
3.
Repair of goods; and
4.
Construction.
(7)
With respect to such goods as specified by the Presidential Decree, despite the provisions of paragraph (6), the provisions of the said paragraph shall apply to only the areas such as Special Metropolitan City, Metropolitan City, etc. prescribed by the Presidential Decree.
<Newly Inserted by Act No. 5234, Dec. 30, 1996>
(8)
For the purpose of this Act, the term "entrustment with the repair" means an entrepreneur engaged in a business for profit to repair goods according to the customer's order, or in a business for profit to repair the goods he is using, entrusts another entrepreneur with the whole or part of such act of repairing.
(9)
For the purpose of this Act, the term "entrustment with the construction" means an entrepreneur falling under any of the following subparagraphs (hereinafter referred to as the "constructor") entrusts another constructor with the whole or part of any construction work resulting from his business, and that a constructor entrusts another entrepreneur with the construction work as prescribed by the Presidential Decree:
<Amended by Act No. 4860, Jan. 5, 1995; Act No. 5234, Dec. 30, 1996; Act No. 5386, Aug. 28, 1997; Act No. 5454, Dec. 13, 1997; Act No. 5756, Feb. 5, 1999; Act No. 6893, May 29, 2003; Act No. 7107, Jan. 20, 2004>
1.
Constructor as prescribed in subparagraph 5 of
Article 2 of the Framework Act on the Construction Industry
;
2.
A construction work businessman as prescribed in subparagraph 3 of
Article 2 of the Electrical Construction Business Act
;
3.
An information and communication construction work businessman as prescribed in subparagraph 4 of
Article 2 of the Information and Communication Work Business Act
;
4.
A person who registers a fire fighting system installation business under Article 4 (1) of the Fire Fighting System Installation Business Act; and
5.
Other entrepreneurs as prescribed by the Presidential Decree.
(10)
For the purpose of this Act, the term "ordering person" means a person who contracts the manufacture, repair, work execution or service performance to a prime contractor:
Provided
, That in case of a resubcontract, it means a prime contractor.
<Newly Inserted by Act No. 5816, Feb. 5, 1999; Act No. 7488, Mar. 31, 2005>
(11)
For the purpose of this Act, the term "service entrustment" means that an entrepreneur who makes a preparation of knowledge and information results or a provision of service duties (hereinafter referred to as the "service") as his business (hereinafter referred to as the "service provider" entrusts the whole or part of the acts of service performance under his business to another service provider.
<Newly Inserted by Act No. 7488, Mar. 31, 2005>
(12)
For the purpose of this Act, the term "knowledge and information results" means what falls under anyone of the following subparagraphs:
<Newly Inserted by Act No. 7488, Mar. 31, 2005>
1.
Information program (software under the provisions of subparagraph 1 of
Article 2 of the Software Industry Promotion Act
, what are collated with a series of instructions and orders indwelling in the apparatus having an information treating capability, such as the computer, electronic calculator, etc. in order to obtain specific results);
2.
The results consisted of movies, broadcasting programs and other images, voices or sounds;
3.
The results consisted of combinations of letters, diagrams and marks or the combinations of these goods and colors (the drawings under subparagraph 3
Article 2 of the Certified Architects Act
and the drawings from among the engineering activities under subparagraph 1 of
Article 2 of the Engineering Technology Promotion Act
); and
4.
Others corresponding to subparagraphs 1 through 3 which are decided and publicized by the Fair Trade Commission.
(13)
For the purpose of this Act, the term "service duties" means the activities corresponding to anyone of the following subparagraphs:
<Newly Inserted by Act No. 7488, Mar. 31, 2005>
1.
Engineering activities under subparagraph 1 of
Article 2 of the Engineering Technology Promotion Act
(excluding the drawings);
2.
Activities to transport or intermediate the cargo by utilizing the trucks under the
Trucking Transport Business Act
;
3.
Activities to maintain and manage the buildings under the
Building Act
;
4.
Activities to perform in order to prevent an occurrence of dangers to installations, places, goods, etc. under the
Security Industry Act
, or to prevent an occurrence of dangers to the life or body of people and to the self protection; and
5.
Other activities as decided and publicized by the Fair Trade Commission, which are the activities to provide labors in order to complete the affairs entrusted from a prime contractor.
법령보기 화면
Article 3 (Delivery of Writing and Keeping of Documents)
(1)
If a prime contractor entrusts a subcontractor with the manufacture, etc., he shall deliver a written document (including an electronic document under the provisions of subparagraph 1 of
Article 2 of the Framework Act on Electronic Commerce
; hereafter in this Article, the same shall apply) in which the prescribed matters are specified to the subcontractor in advance (in case of the entrustment with the manufacture, before a subcontractor commences any work for the supply of goods; in case of the entrustment with the repair, before a subcontractor commences any act of the repair for which a contract is concluded; in case of the entrustment with the construction, before a subcontractor commences any contracted construction work; in case of service entrustment, before the undertaking of service performance acts by the subcontracor for which a contract has been concluded) unless there exists any justifiable reason.
<Amended by Act No. 5816, Feb. 5, 1999; Act No. 7107, Jan. 20, 2004; Act No. 7488, Mar. 31, 2005>
(2)
The document as referred to in paragraph (1) of this Article shall include the subcontract price and the matters as prescribed by the Presidential Decree, such as the method of payment, etc., and the prime contractor and the subcontractor shall sign (including a certified digital signature under the provisions of subparagraph 3 of
Article 2 of the Digital Signature Act
) or put their signatures and affix their seals on it.
<Amended by Act No. 7107, Jan. 20, 2004>
(3)
The prime contractor and the subcontractor shall keep the documents concerning the subcontract under the provisions of the Presidential Decree.
법령보기 화면
Article 3-2 (Preparation and Use of Standard Subcontract Form)
The Fair Trade Commission may recommend the preparation and use of the standard subcontract form to the entrepreneur or entrepreneurs organization to which this Act applies.
[This Article Newly Inserted by Act No. 4860, Jan. 5, 1995]
법령보기 화면
Article 4 (Prohibition of Determination of Unreasonable Subcontract Price)
(1)
In the event that a prime contractor entrusts a subcontractor with the manufacture, etc., he shall not compel the subcontractor to determine the subcontract price at a remarkably lower level than the price paid ordinarily for the same or similar manufacture, etc. of the objects, etc. by using unlawful methods (hereinafter referred to as the "determination of the unreasonable subcontract price"), or to accept such subcontract.
<Amended by Act No. 7488, Mar. 31, 2005>
(2)
If the act of the prime contractor falls under one of the following subparagraphs it shall be considered as the determination of the unreasonable subcontract price as referred to in paragraph (1) of this Article:
<Amended by Act No. 7488, Mar. 31, 2005>
1.
An act determining the subcontract price by reducing the unit price at a uniform rate, without any justifiable reasons;
2.
An act determining the subcontract price by deducting any amount after allotting unilaterally such amount, regardless of the pretext, such as a request for cooperation, etc.;
3.
An act determining the subcontract price by discriminating against any specified subcontractor without any justifiable reasons;
4.
An act determining the subcontract price by causing the subcontractor to make an error regarding the terms and conditions of the transaction such as the ordered quantity, etc., or by deceiving the subcontractor in such a way as to show him the quotations of another entrepreneur or false quotations to take advantage of it;
5.
An act of deciding the subcontract price under the lower unit price unilaterally by a prime contractor without the agreement of the subcontractor;
6.
In deciding the subcontract by the negotiated contract, an act of deciding the subcontract price under the lower price than the addedup price of the prices under direct work expenses item as prescribed by the Presidential Decree without any lawful reasons; and
7.
An act of deciding the subcontract price under the lower price than the lowest tender price without any lawful reasons in concluding the subcontract by the competitive bidding.
법령보기 화면
Article 5 (Prohibition of Forced Purchase of Goods, etc.)
In making an entrustment with the manufacture, etc. to a subcontractor, the prime contractor shall not compel the subcontractor, with the exception of cases where there exist lawful reasons, such as the maintenance, improvement, etc. of the relevant objects, etc. to purchase or use (including utilization; hereinafter the same shall apply) any goods, equipment, or the provision of service duties, etc. designated by him,
[This Article Wholly Amended by Act No. 7488, Mar. 31, 2005]
법령보기 화면
Article 6 (Payment of Advance)
(1)
If the prime contractor who has entrusted a subcontractor with the manufacture, etc., receives any advance from the ordering person, he shall pay the advance to the subcontractor to enable him to undertake the manufacture, repair or work execution, or service performance in accordance with the contents and ratio of the advance within fifteen days after he has received it (if he has received it before he entrusts the manufacture, etc., the day on which he entrusts the manufacture, etc.).
<Amended by Act No. 7488, Mar. 31, 2005>
(2)
If the prime contractor pays the advance received from the ordering person beyond the time limit as referred to in paragraph (1) of this Article, he shall pay the interest calculated by the interest rate prescribed and notified by the Fair Trade Commission by taking account of the economic situations such as overdue interest rates, etc. applied by the financial institutions established under the
Banking Act
within the limit of 40/ 100 per year.
<Newly Inserted by Act No. 4514, Dec. 8, 1992; Act No. 5507, Jan. 13, 1998; Act No. 7107, Jan. 20, 2004>
(3)
The provisions of
Article 13
(Payments, etc. of Subcontract Prices) (6) and (8) shall apply
mutatis mutandis
to discount charges payment and rates for the bill if such bill is paid by a prime contractor as an advance under paragraph (1) of this Article. In this case, the wording "sixty days from the date when such objects, etc. have been received" shall be considered as the wording "fifteen days from the date when the prime contractor has received the advance payments from the ordering person".
<Newly Inserted by Act No. 5234, Dec. 30, 1996; Act No. 5816, Feb. 5, 1999; Act No. 7488, Mar. 31, 2005>
법령보기 화면
Article 7 (Opening of Local Letter of Credit)
If the prime contractor entrusts the subcontractor with the manufacture or service of the goods to be exported, he shall open a local letter of credit in favor of the subcontractor, within fifteen days from the date of the entrustment, unless there is any justifiable reason:
Provided
, That in the case of an export under a letter of credit, if the prime contractor entrusts the manufacture or service before he receives the original letter of credit, he shall open the local letter of credit within fifteen days after he has received the original letter of credit.
<Amended by Act No. 4514, Dec. 8, 1992; Act No. 7488, Mar. 31, 2005>
법령보기 화면
Article 8 (Prohibition of Unreasonable Cancelation of Entrustment)
(1)
No prime contractor shall perform the acts falling under anyone of the following subparagraphs unless there exists any reason attributable to the subcontractor after making an entrustment with the manufacture, etc.:
Provided
, That the provisions of subparagraph 2 shall not apply to the case of making an entrustment of supply of service duties from among the service entrustments:
1.
An act of cancelling or altering the entrustment with the manufacture, etc. unilaterally; and
2.
An act of refusing or delaying the receipt or takeover of the supply, etc. of the objects, etc.
(2)
Where there are supply, etc. of the objects, etc. the prime contractor shall deliver the certificate of receipt to the subcontractor immediately (immediately after a completion of inspection in the case of opening a local letter of credit pursuant to the provisions of
Article 7
even before an inspection except for the case of an entrustment of supply of service duties):
Provided
, That in the case of an entrustment with the construction, he shall take over the object immediately upon a completion of inspection.
(3)
For the purpose of paragraph (1) 2 of this Article, the term "receipt" means what places under the actual control of a prime contractor who receives the objects, etc. delivered by the subcontractor, and places it under his control:
Provided
, That if it is difficult to move the objects, etc., the time when the inspection commences shall be considered as the time of receipt.
[This Article Wholly Amended by Act No. 7488, Mar. 31, 2005]
법령보기 화면
Article 9 (Criteria, Method and Time of Inspection)
(1)
The criteria and method of the inspection of the objects, etc. supplied by the subcontractor shall be determined after the prime contractor consults with the subcontractor, but it shall be objective, impartial and reasonable.
<Amended by Act No. 7488, Mar. 31, 2005>
(2)
Unless there is any justifiable reason, the prime contractor shall notify in writing the subcontractor of the result of the examination of the objects, etc. within ten days from the date when he has received such goods (in the case of the entrustment with the manufacture, it includes the date when the portion of manufacturing work performed has been notified, and in the case of the entrustment with the construction, it includes the date when the subcontractor has notified the completion of construction work, or the portion of construction work completed). In the absence of such notification within the prescribed period, the objects, etc. shall be deemed to have passed the inspection:
Provided
, That the same shall not apply to the case of entrusting the supply of service duties from among the service entrustments.
<Amended by Act No. 5234, Dec. 30, 1996, Act No. 7488, Mar. 31, 2005>
법령보기 화면
Article 10 (Prohibition of Unreasonable Return)
(1)
When the prime contractor has receoved the supply, etc. of the objects, etc. from the subcontractor, he shall not return them to the subcontractor, unless there exists any reason attributable to the subcontractor (hereinafter referred to as the "unreasonable return"):
Provided
, That in the case of entrusting the supply of service duties from among the service entrustments, the same shall not be applied.
<Amended by Act No. 7488, Mar. 31, 2005>
(2)
The acts of the prime contractor which fall under any of the following subparagraphs shall be considered as the unreasonable return under paragraph (1) of this Article:
<Amended by Act No. 7488, Mar. 31, 2005>
1.
An act of returning the objects, etc. by reason of a cancellation of the order from the other party to the transaction, or any change in the economic situation, etc.;
2.
An act of returning the objects, etc. by determining vaguely the criteria and method of inspection, and thereby judging the objects, etc. as ones which fail to pass the inspection;
3.
An act of returning the objects, etc. although it is judged as inferior due to the inferior quality of the raw materials supplied by the prime contractor; and
4.
An act of returning the objects, etc. by reason of a delay of supply, although it is caused by a delay in the supply of raw materials by the prime contractor.
법령보기 화면
Article 11 (Prohibition of Unreasonable Reduction of Price)
(1)
The prime contractor shall not reduce unreasonably the subcontract price determined at the time of the entrustment of the manufacture, etc. (hereinafter referred to as the "unreasonable reduction of the price"), unless there is any reason attributable to the subcontractor.
(2)
The acts of the prime contractor which fall under any of the following subparagraphs shall be considered as an unreasonable reduction of the price under paragraph (1) of this Article:
<Amended by Act No. 7488, Mar. 31, 2005>
1.
An act of reducing the subcontract price by unjustifiable reasons, such as a request for cooperation, cancellation of the order by the other party to the transaction, a change in the economic situation, etc., after making the entrustment without specifying the conditions on which the subcontract price will be reduced at the time of the entrustment;
2.
An act of reducing the subcontract price by applying unilaterally and retroactively the unit price reduced by an agreement with the subcontractor on the reduction thereof to any portion entrusted prior to such agreement;
3.
An act of reducing excessively the subcontract price for the reason that the subcontract price is paid in cash or prior to the due date of payment;
4.
An act of reducing unilaterally the subcontract price for the reason of any insignificant fault of the subcontractor, which does not have any substantial effect on the occurrence of damage against the prime contractor;
5.
An act of deducting any amount more than the proper purchase price or the price of use from the subcontract price, if the prime contractor has the subcontractor purchase from him the goods, etc. required for the manufacture, repair, work execution or service performance of the objects, etc. or use his equipment, etc.;
6.
An act of reducing the subcontract price on the reasons that the market price or the material price, etc. at the time of subcontract price payment has fallen in contrast of the price at the time of supply, etc.;
7.
An act of unfairly reducing the subcontract price on the unreasonable reasons such as the management deficit or a deduction of the sales price, etc.; and
8.
An act of sharing to the subcontractor, the employment insurance premium, the management expenses of industrial safety and health, other expenses, etc. to be borne by the prime contractor under the Act on the Collection of Insurance Premium, etc. for Employment Insurance and Industrial Accident Compensation Insurance, or the
Industrial Safety and Health Act
, etc.
(3)
If the prime contractor pays the price reduced unfairly in violation of paragraph (1) of this Article more than sixty days after receipt of the objects, etc., the prime contractor shall pay interest accrued for the period beyond sixty days on the price in accordance with interest rates prescribed and notified by the Fair Trade Commission by taking account of the economic situations such as overdue interest rates, etc. applied by the financial institutions established under the
Banking Act
within the limit of 40/100 per year.
<Amended by Act No. 5234, Dec. 30, 1996; Act No. 5507, Jan. 13, 1998; Act No. 7107, Jan. 20, 2004; Act No. 7488, Mar. 31, 2005>
법령보기 화면
Article 12 (Prohibition of Unfair Request for Settlement of Goods Purchase Price, etc.)
If the prime contractor has made the subcontractor purchase from him the goods, etc. required for the manufacture, repair, work execution, or service performance of the objects, etc., or use his equipment, etc., he shall not make the subcontractor pay the whole or part of the price of purchase or the price of use prior to the date of payment of the subcontract price for the relevant objects, etc., or pay it under remarkably unfavorable conditions compared with the conditions under which he purchases or uses them, or supplies them to a third person, without any justifiable reasons.
<Amended by Act No. 7488, Mar. 31, 2005>
[This Article Wholly Amended by Act No. 4860, Jan. 5, 1995]
법령보기 화면
Article 12-2 (Prohibition of Unfair Request for Economic Interests)
The prime contractor shall not perform the act to make the subcontract or to provide the money, goods, service and other economic interests for himself or the third person, without any justifiable reasons.
[This Article Newly Inserted by Act No. 7488, Mar. 31, 2005]
법령보기 화면
Article 13 (Payment, etc. of Subcontract Price)
(1)
If the prime contractor entrusts the subcontractor with the manufacture, etc., he shall pay the subcontract price by the date of payment determined to be the shortest term within the limit of sixty days from the date of receiving the objects, etc. (in the case of the entrustment with the construction, it refers to the date of taking over the objects, etc.; in the case of service entrustment, the date when the subcontractor has completed the performance of the service entrusted; and if the prime contractor and the subcontractor determine the date of issue of the tax invoice to be once or more a month because of frequent supply, etc., it refers to such determined date; hereinafter the same shall apply), except the cases which fall under any of the following subparagraphs:
<Amended by Act No. 4514, Dec. 8, 1992; Act No. 7488, Mar. 31, 2005>
1.
Where it is deemed that the prime contractor and the subcontractor have determined the date of payment on an equal status; and
2.
Where the date of payment is deemed reasonable in light of the characteristics of the business and the economic conditions.
(2)
If the payment date of the subcontract price is not determined, the date of receiving the objects, etc. shall be considered as the payment date of subcontract price, and if the date of payment is determined in excess of sixty days from the receipt date of the objects, etc. (excluding the case falling under the proviso of paragraph (1) of this Article), the sixtieth day from the receipt date of the objects, etc. shall be considered as the payment date of the subcontract price, respectively.
<Amended by Act No. 7488, Mar. 31, 2005>
(3)
Where the prime contractor has entrusted the subcontractor with the manufacture, etc., he shall pay the prime contractor the subcontract price if the prime contractor has received from the ordering person the work-completion money, etc. as completing the manufacture, repair, work execution or service performance act, or the amount corresponding to the portion of the manufacture, repair, work execution or service performance if the prime contractor has received the money for alreadycompleted portion, etc. following the progress of the manufacture, repair, work execution or service performance act. within 15 days from the date of said payment (the said payment date in the case where the payment date of subcontract has arrived before it).
<Amended by Act No. 7488, Mar. 31, 2005>
(4)
In paying a subcontract price to a subcontractor, a prime contractor shall not pay less than the proportion of cash which an ordering person gives in connection with the entrustment with the manufacture, etc. concerned.
<Newly Inserted by Act No. 5816, Feb. 5, 1999>
(5)
If a prime contractor pays a subcontract price by a bill, he shall not deliver a bill exceeding a period of payment (from the issuance date till the due date) of another bill which an ordering person delivers to him in connection with the entrustment with the manufacture, etc. concerned.
<Newly Inserted by Act No. 5816, Feb. 5, 1999>
(6)
If the prime contractor pays the subcontract price by a bill, it shall be the one which can be discounted at any financial institution established under the Acts and the discount charges for the period from the delivery date of the bill to the due date thereof shall be paid to the subcontractor on the day on which the bill is delivered:
Provided
, That if the bill is delivered within sixty days after the objects, etc. are received (if the date of payment is determined under the proviso of paragraph (1) of this Article, it refers to the date of payment, and if any money for completion or already-completed portion, etc. is paid by the ordering person, it refers to the date as referred to in paragraph (3) of this Article; hereinafter this Article, the same shall apply), the discount charges for the period from the date on which sixty days have exceeded since the date of receiving the objects, etc., to the due date of the bill shall be paid to the subcontractor within sixty days from the date of receiving the objects, etc.
<Amended by Act No. 4860, Jan. 5, 1995; Act No. 7488, Mar. 31, 2005>
(7)
If the prime contractor pays the subcontract price after the expiration of sixty days from the date of receiving the objects, etc., he shall pay the interest calculated by interest rates determined and notified by the Fair Trade Commission for such overdue days by taking account of the economic situations such as overdue interest rates, etc. applied by the financial institutions established under the
Banking Act
within the limit of 40/100 per year.
<Amended by Act No. 4514, Dec. 8, 1992; Act No. 4860, Jan. 5, 1995; Act No. 5234, Dec. 30, 1996; Act No. 5507, Jan. 13, 1998; Act No. 7107, Jan. 20, 2004; Act No. 7488, Mar. 31, 2005>
(8)
The discount rate applicable under paragraph (6) of this Article shall be determined and announced publicly by the Fair Trade Commission taking into consideration the commercial bill discount rates applicable by the financial institutions established on the basis of the Acts within the limit of 40/100 per year.
<Newly Inserted by Act No. 4514, Dec. 8, 1992; Act No. 5816, Feb. 5, 1999; Act No. 7488, Mar. 31, 2005>
법령보기 화면
Article 13-2 (Guarantee for Performance of Construction Subcontracts and for Payment of Price)
(1)
In the case of entrustment with the construction, the prime contractor shall provide guarantees for the payment of the price for construction work in accordance with the categories which fall under each of the following subparagraphs, while the subcontractor shall provide the performance bond equivalent to ten percent of the agreed price of such construction work:
Provided
, That if the financial status of the prime contractor or the size of construction work does not require such guarantees, or if such guarantees are deemed inappropriate under the provisions of the Presidential Decree, this shall not apply:
1.
The amount of the price calculated by the deduction of an advance payment from the contract amount in the case of the construction work for the period not exceeding four months;
2.
The amount of the price calculated by the following computation formula in the case of construction work for a period of more than four months, during which the period of installment for the completed poron of the work is not more than two months: and
3.
The amount of the price calculated by the following computation formula in the case of construction work for a period of more than four months, during which the period of installment for the completed portion of the work is more than two months:
(Amount of Guarantee)={(Subcontract amount Agreed advance payment) ÷ (Period of Construction Work (Number of months)} × (period of installment for the completed portion of the Work (Number of months)) × 2
(2)
Such guarantees or bonds as between the prime contractor and subcontractor in accordance with paragraph (1) of this Article shall be delivered in cash (including cashier's check issued by post offices, or by banking institutions under the
Banking Act
) or by the guarantee certificates issued by the institutions which fall under any of the following subparagraphs:
<Amended by Act No. 5454, Dec. 13, 1997; Act No. 7107, Jan. 20, 2004>
1.
Each mutual-aid association under the
Framework Act on the Construction Industry
;
2.
Insurance companies under the
Insurance Business Act
;
3.
Credit Guarantee Fund under the
Credit Guarantee Fund Act
;
4.
Banking institutions under the
Banking Act
; or
5.
Other guarantee institutions prescribed by the Presidential Decree.
(3)
Where the prime contractor delivers the guarantee certificates in accordance with paragraph (2) of this Article, the prime contractor may deliver one guarantee certificate evidencing a guarantee for the payment of the price for all construction works which have been entrusted with the construction during the relevant period of construction work, or for one fiscal year.
(4)
Apart from such matters specified in paragraphs (1) through (3), the matters necessary for the performance bond for the subcontracts and guarantee of the price payments of subcontracts shall be prescribed by the Presidential Decree.
(5)
Where the prime contractor fails to guarantee the payment of the price of construction work price under the main sentence of paragraph (1), the subcontractor may not guarantee the execution of contract.
<Newly Inserted by Act No. 7488, Mar. 31, 2005>
[This Article Newly Inserted by Act No. 5234, Dec. 30, 1996]
법령보기 화면
Article 14 (Direct Payment of Subcontract Price)
(1)
When a subcontractor requests a direct payment of the subcontract price equivalent to the portion of the manufacture, repair, work execution, or service performance in case where any reason falling under any of the following subparagraphs has occurred, the ordering person shall directly pay the said price to the relevant subcontractor:
<Amended by Act No. 7107, Jan. 20, 2004; Act No. 7488, Mar. 31, 2005>
1.
Where there exists any payment suspension or bankruptcy of the prime contractor and other similar reasons, or where the prime contractor has become unable to pay a subcontract price as the permission, authorization, license, registration etc. relating to the business were revoked;
2.
Where an agreement has been made among the ordering person, prime contractor and subcontractor that the ordering person shall pay the subcontract price directly to the subcontractor;
3.
Where the prime contractor has failed to pay to the relevant subcontractor two or more installments of the subcontract price to be paid by him under the provisions of
Article 13
(1) or (3); and
4.
Where the prime contractor has failed to perform his liability for guaranteeing a payment of subcontract price under the provisions of
Article 13-2
(1).
(2)
If there occurs any reason as prescribed in paragraph (1), a price payment obligation of an ordering person to a prime contractor and a subcontract price payment obligation of a prime contractor to a subcontractor shall be deemed to be extinguished within the limit of a price which is directly paid under paragraph (1).
(3)
If a prime contractor requires the suspension of direct payment of a subcontract price concerned with documents which are able to prove the fact that a subcontractor delays the payment of wages or prices of materials in connection with a subcontract concerned, an ordering person may not pay the said subcontract price directly notwithstanding the provisions of paragraph (1).
(4)
When an ordering person pays the subcontract price directly to the relevant subcontractor under the provisions of paragraph (1), he shall deduct therefrom the subcontract price that has been already paid by an ordering person to the prime contractor.
<Newly Inserted by Act No. 7107, Jan. 20, 2004>
(5)
Where any verification, etc. of accomplished portions is required for the subcontractor to obtain a direct payment of subcontract price from the ordering person under the provisions of paragraph (1), the prime contractor shall promptly take the measures required therefor.
<Newly Inserted by Act No. 7107, Jan. 20, 2004>
(6)
Matters necessary for the methods and procedures, etc. for payments in case where the subcontract price is directly paid under the provisions of paragraph (1), shall be prescribed by the Presidential Decree.
<Newly Inserted by Act No. 7107, Jan. 20, 2004>
[This Article Wholly Amended by Act No. 5816, Feb. 5, 1999]
법령보기 화면
Article 15 (Payment of Refund of Customs Duties)
(1)
If the prime contractor entrusts the subcontractor with the manufacture or service entrustment for the goods to be exported and if he has the customs duties refunded under the
Act on Special Cases concerning the Refundment of Customs Duties, etc. Levied on Raw Materials for Export
, he shall pay the refunded amount to the subcontractor in accordance with contents of the received refund within fifteen days after he has received it.
<Amended by Act No. 7488, Mar. 31, 2005>
(2)
Notwithstanding the provisions of paragraph (1) of this Article, the due date for the payment of the amount equivalent to the refund of customs duties, etc. to the subcontractor may not exceed sixty days from the date of receiving the objects, etc., unless there is any reason attributable to the subcontractor.
<Amended by Act No. 7488, Mar. 31, 2005>
(3)
If the prime contractor pays the amount equivalent to the refund of the customs duties, etc. beyond the due date as referred to in paragraphs (1) and (2) of this Article, he shall pay interest calculated by the interest rate prescribed and notified by the Fair Trade Commission for such overdue days by taking account of the economic situations such as overdue interest rates, etc. applied by the financial institutions established under the
Banking Act
within the limit of 40/100 per year.
<Newly Inserted by Act No. 4514, Dec. 8, 1992; Act No. 5507, Jan. 13, 1998; Act No. 7107, Jan. 20, 2004>
법령보기 화면
Article 16 (Adjustment of Subcontract Price Due to Change of Design)
(1)
If the prime contractor receives any additional amount from the ordering person due to any change of the design, the economic situation, etc., after entrusting the manufacture, etc., if any additional expenses are required for achieving or completing the objects, etc. for the same reason, he shall increase the subcontract price in proportion to the contents and rate of the additional amount he has received, and if he has the amount reduced by the ordering person, he may reduce the subcontract price in proportion to it.
<Amended by Act No. 7488, Mar. 31, 2005>
(2)
The increase or decrease in the subcontract price as referred to in paragraph (1) of this Article shall be made within thirty days after the prime contractor has the price increased or decreased by the ordering person.
<Newly Inserted by Act No. 4860, Jan. 5, 1995>
(3)
The provisions of
Article 13
(Payments, etc. of Subcontract Price) (7) shall apply
mutatis mutandis
to interests accrued if the prime contractor pays the subcontract price in excess of fifteen days after receiving the additional amount under paragraph (1) above while the provisions of paragraphs (6) and (8) of the said Article shall apply
mutatis mutandis
to the payment of discount charges or rates of the bill if the additional amount has been paid by a bill respectively. In this case, the provision "sixty days from the date when such objects, etc. have been received" shall be considered as "fifteen days from the date when the additional amount has been received".
<Newly Inserted by Act No. 5234, Dec. 30, 1996; Act No. 5816, Feb. 5, 1999; Act No. 7488, Mar. 31, 2005>
법령보기 화면
Article 17 (Prohibition of Unreasonable Payment in Accord and Satisfaction)
The prime contractor shall not pay the subcontract price with goods contrary to the intention of the subcontractor.
법령보기 화면
Article 18 (Prohibition of Unreasonable Intervention in Management)
The prime contractor shall not intervene in the management of the subcontractor by means of regulating the quantity of the subcontract.
법령보기 화면
Article 19 (Prohibition of Retaliatory Measures)
The prime contractor shall not do any act limiting the opportunity of the subcontractor to receive the order, suspending the transactions with him, or giving him any other disadvantageous treatment for the reason that he has informed the related agency, etc. of any violation of this Act by the prime contractor.
법령보기 화면
Article 20 (Prohibition of Evasion of this Act)
The prime contractor shall not do any act evading or circumventing substantially the application of this Act in connection with the subcontract.
법령보기 화면
Article 21 (Matters to be Observed by Subcontractor)
(1)
The subcontractor shall, upon being entrusted with the manufacture, etc. by the prime contractor, fulfill the contents of the entrustment in faith and trust.
(2)
No subcontractor shall cooperate with the prime contractor in any offense against this Act.
(3)
The subcontractor shall, upon making a report as prescribed by this Act, present promptly documentary evidence, etc. to the Fair Trade Commission.
<Amended by Act No. 4198, Jan. 13, 1990>
법령보기 화면
Article 22 (Report, etc. on Offense)
(1)
If it is deemed that there exists any fact contrary to this Act, any person may report it to the Fair Trade Commission.
<Amended by Act No. 4198, Jan. 13, 1990>
(2)
If there is a report as referred to in paragraph (1) of this Article, or it is deemed that there exists any fact contrary to this Act, the Fair Trade Commission may conduct any necessary investigation.
<Amended by Act No. 4198, Jan. 13, 1990>
(3)
If the Fair Trade Commission receives a report from the subcontractor of any offense of the prime contractor and notifies it to the prime contractor, the demand as prescribed in
Article 174 of the Civil Act
shall be considered to have been made, unless the reported case is dismissed, rejected or withdrawn.
<Newly Inserted by Act No. 4514, Dec. 8, 1992>
법령보기 화면
Article 23 (Limitation on Transaction Subject to Investigation)
A subcontract transaction which may be subject to an investigation by the Fair Trade Commission under
Article 22
(Reports, etc. as to Offences) (2) shall be limited to one for which three years have not passed from the day on which the transaction is closed:
Provided
, That in a case where a subcontract transaction is reported within three years from the day on which the transaction is closed, the investigation may be conducted even though three years have passed from the day on which the transaction is closed.
<Amended by Act No. 4860, Jan. 5, 1995; Act No. 5234, Dec. 30, 1996>
[This Article Wholly Amended by Act No. 4514, Dec. 8, 1992]
법령보기 화면
Article 24 (Subcontract Dispute Mediation Council)
(1)
The entrepreneur organization as prescribed by the Presidential Decree shall establish the Subcontract Dispute Mediation Council (hereinafter referred to as the "Council").
(2)
The Council shall confirm the fact with respect to any dispute over a subcontract transaction between a prime contractor and a subcontractor, and mediate it, upon the request of the Fair Trade Commission.
<Amended by Act No. 4198, Jan. 13, 1990; Act No. 5234, Dec. 30, 1996>
(3)
When the dispute is mediated, the Council shall report without delay the result to the Fair Trade Commission, and if not mediated, the reasons for the failure to mediate it.
<Amended by Act No. 4198, Jan. 13, 1990>
(4)
Matters necessary for the composition, operation, etc. of the Council, shall be prescribed by the Presidential Decree.
법령보기 화면
Article 24-2 (Advisors)
(1)
The Fair Trade Commission may designate advisors, if it is deemed necessary for the performance of functions and duties arising out of subcontract transactions under this Act.
(2)
The designation of advisors pursuant to paragraph (1) of this Article and other necessary matters shall be prescribed by the Presidential Decree.
[This Article Newly Inserted by Act No. 5234, Dec. 30, 1996]
법령보기 화면
Article 25 (Corrective Measures)
(1)
The Fair Trade Commission may recommend or order an ordering person and a prime contractor who have violated the provisions of
Articles 3
(Delivery of Writing and Keeping of Documents) and
4
(Prohibition of Determination of Unreasonable Subcontract Price)
through 12
(Prohibition of Unfair Request for Settlement of Goods Purchase Price, etc.),
12-2
(Prohibition of Unfair Request for Economic Interests),
13
(Payment, etc. of Subcontract Price),
13-2
(Guarantee for Performance of Construction Subcontracts and for Payment of Price),
14
(Direct Payment of Subcontract Price)
through 20
(Prohibition of Evasion of this Act) to pay a subcontract price, to discontinue such violations, and to take other measures necessary for correcting the relevant violations.
<Amended by Act No. 4198, Jan. 13, 1990; Act No. 4860, Jan. 5, 1995; Act No. 5234, Dec. 30, 1996; Act No. 5816, Feb. 5, 1999; Act No. 7488, Mar. 31, 2005>
(2)
If the mediation of the Council is made under
Article 24
(Subcontract Dispute Mediation Council) (2), it shall be deemed that the Fair Trade Commission has taken measures necessary for the correction under paragraph (1) in such a manner as the Council has mediated the dispute, unless there is any special reason.
<Amended by Act No. 4198, Jan. 13, 1990; Act No. 5234, Dec. 30, 1996>
(3)
Deleted.
<by Act No. 4198, Jan. 13, 1990>
(4)
The Fair Trade Commission may, upon issuing a correction order (excluding the correction order as referred to in paragraph (2); hereafter in this paragraph, the same shall apply) under paragraph (1), order the prime contractor who has received the order, to announce publically the fact that he has received such an order.
<Amended by Act No. 4860, Jan. 5, 1995>
법령보기 화면
Article 25-2 (Deposit)
If the subcontractor fails to receive is unable to receive redemption, the prime contractor who has received the correction order as prescribed in
Article 25
(Corrective Measures) (1) or (2) may be exempted from the obligation to perform the corrective measures by depositing the object of redemption in favor of the subcontractor. This shall also apply if it is impossible for the prime contractor without his fault to identify the subcontractor.
<Amended by Act No. 5234, Dec. 30, 1996>
[This Article Newly Inserted by Act No. 4514, Dec. 8, 1992]
법령보기 화면
Article 25-3 (Penalty)
(1)
The Fair Trade Commission may impose upon an ordering person, a prime contractor or a subcontractor falling under any of the following subparagraphs a penalty not exceeding the amount double the subcontract price for the entrustment of the manufacture, etc. to the subcontractor or the subcontract price for the entrustment of the manufacture, etc. by the ordering person or the prime contractor:
<Amended by Act No. 5816, Feb. 5, 1999; Act No. 7107, Jan. 20, 2004; Act No. 7488, Mar. 31, 2005>
1.
A prime contractor who fails to deliver a written document or delivers a false written document in violation of
Article 3
(Delivery of Writing and Keeping of Documents) (1) and (2);
2.
A person who fails to keep the documents in violation of
Article 3
(Delivery of Writing and Keeping of Documents) (3), or the contractor or the subcontractor who prepares or delivers the documents of a subcontract in a fraudulent way;
3.
A prime contractor who violates the provisions of
Articles 4
(Prohibition of Determination of Unreasonable Subcontract Price)
through 12
(Prohibition of Unfair Request for Goods Purchase Price, etc.),
12-2
(Prohibition of Unfair Request for Economic Interests),
13
(Payment, etc. of Subcontract Price),
13-2
(Guarantee for Performance of Construction Subcontracts and for Payment of Price);
4.
An ordering person who violates
Article 14
(Direct Payment of Subcontract Price) (1);
4-2. A prime contractor who violates
Article 14
(Direct Payment of Subcontract Price) (5); or
5.
A prime contractor who violates
Articles 15
(Payments of Refunded Customs Duties, etc.)
through 20
(Prohibition of Evasion of this Act).
(2)
The provisions of
Articles 55-3
(Imposition of Penalty Subcharges)
through 55-7
(Additional Payment for Refund of Surcharge) under the
Monopoly Regulation and Fair Trade Act
shall apply
mutatis mutandis
to the penalty under paragraph (1) of this Article.
<Amended by Act No. 7315, Dec. 31, 2004; Act No. 7488, Mar. 31, 2005>
[This Article Newly Inserted by Act No. 5234, Dec. 30, 1996]
법령보기 화면
Article 26 (Cooperation by Head of Administrative Agency Concerned)
(1)
If it is deemed necessary for enforcing this Act, the Fair Trade Commission may hear the opinion of the head of the administrative agency concerned or request him to provide the support of personnel to conduct an investigation and other necessary cooperation.
<Amended by Act No. 4198, Jan. 13, 1990>
(2)
The Fair Trade Commission may request the head of the administrative agency concerned to limit the eligibility of persons participating in any tender, to suspend the business as prescribed in
Article 82 (1) 6 of the Framework Act on the Construction Industry
and to take other measures necessary for the fairness of a subcontract transaction with regard to any prime contractor or subcontractor who violates habitually the provisions of this Act.
<Amended by Act No. 4198, Jan. 13, 1990; Act No. 4860, Jan. 5, 1995; Act No. 5454, Dec. 13, 1997>
법령보기 화면
Article 27 (Mutatis Mutandis Application of Monopoly Regulation and Fair Trade Act)
(1)
The provisions of
Articles 42
(Proceedings and Quorum of Meeting)
through 45
(Signature and Use of Seals by Members) and
52
(Opportunity of Hearings) of the
Monopoly Regulation and Fair Trade Act
shall be applicable
mutatis mutandis
to the deliberation and decision of the Fair Trade Commission under this Act while
Articles 53
(Submission of Complaints)
through 55-2
(Procedures for Handling Cases, etc.) of the said Act shall be apply
mutatis mutandis
to the exclusive jurisdiction over any submission of complaints, institution of a lawsuit, or litigation by appeal against any disposition of the Fair Trade Commission.
<Amended by Act No. 4198, Jan. 13, 1990; Act No. 4860, Jan. 5, 1995; Act No. 5234, Dec. 30, 1996>
(2)
The provisions of
Articles 50
(Investigation, etc. of Unlawful Practices) and
51
(Recommendation for Correction of Unlawful Practices) of the
Monopoly Regulation and Fair Trade Act
shall be applicable
mutatis mutandis
to any investigation, hearing of opinion, recommendation for correction, etc. of the Fair Trade Commission, which are required for enforcement of this Act.
<Amended by Act No. 4514, Dec. 8, 1992; Act No. 4860, Jan. 5, 1995; Act No. 5234, Dec. 30, 1996; Act No. 7107, Jan. 20, 2004>
(3)
The provisions of
Article 62
(Obligation of Confidentiality) of the
Monopoly Regulation and Fair Trade Act
shall be applicable
mutatis mutandis
to any member of the Fair Trade Commission and public official who performs or used to perform the duties as prescribed by this Act, or any person who is or was in charge of the affairs concerning the conciliation of any dispute over a subcontract transaction for the Council.
<Amended by Act No. 4198, Jan. 13, 1990; Act No. 4860, Jan. 5, 1995; Act No. 5234, Dec. 30, 1996>
법령보기 화면
Article 28 (Relation with Monopoly Regulation and Fair Trade Act)
The provisions of
Article 23
(Prohibition of Unfair Trade Practices) (1) 4 of the
Monopoly Regulation and Fair Trade Act
shall not be applicable to the matters concerning a subcontract transaction to which this Act applies.
<Amended by Act No. 4198, Jan. 13, 1990; Act No. 5234, Dec. 30, 1996>
법령보기 화면
Article 29 (Penal Provisions)
Any person who violates the provisions of
Article 27
(Mutatis Mutandis Application of
Monopoly Regulation and Fair Trade Act
) (3) shall be punished by imprisonment for not more than two years, or a fine not exceeding two million won.
<Amended by Act No. 4514, Dec. 8, 1992; Act No. 5234, Dec. 30, 1996>
법령보기 화면
Article 30 (Penal Provisions)
(1)
A prime contractor falling under any of the following subparagraphs shall be punished by a fine not exceeding the amount equivalent to double the subcontract price for the manufacture, etc. entrusted to the subcontractor by the prime contractor:
<Amended by Act No. 5234, Dec. 30, 1996; Act No. 7107, Jan. 20, 2004; Act No. 7488, Mar. 31, 2005>
1.
and 2. Deleted;
<by Act No. 5234, Dec. 30, 1996>
3.
A person who violates the provisions of
Articles 4
(Prohibition of Determination of Unreasonable Subcontract Price)
through 12
(Prohibition of Unfair Request for Settlement of Goods Purchase Price),
12-2
(Prohibition of Unfair Request for Economic Interests) and
13
(Payments, etc. of Subcontract Price);
3-2. A person who fails to guarantee a payment of construction work prices in violation of
Article 13-2
(Guarantee for Performance of Construction Subcontracts and for Payment of Price) (1); and
4.
A person who violates the provisions of
Articles 15
(Payment of Refund of Customs Duties)
through 17
(Prohibition of Unreasonable Payment Accord and Satisfaction).
(2)
Any person who falls under any of the following subparagraphs shall be punished by a fine not exceeding one hundred and fifty million won:
<Amended by Act No. 4514, Dec. 8, 1992; Act No. 4860, Jan. 5, 1995; Act No. 5234, Dec. 30, 1996>
1.
A person who violates the provisions of
Articles 18
(Prohibition of Unreasoable Intervention in Management)
through 20
(Prohibition of Evasion of this Act); and
2.
A person who fails to comply with an order as prescribed in
Article 25
(Corrective Measures) (1), (2) or (4).
(3)
Any person who conducts a false appraisal in violation of the provisions of
Article 50
(Investigation, etc. of Violations) (1) 2 of the
Monopoly Regulation and Fair Trade Act
which is applicable mutatis mutandis under the provisions of
Article 27
(Mutatis Mutandis Application of
Monopoly Regulation and Fair Trade Act
) (2) shall be punished by a fine not exceeding thirty million won.
<Newly Inserted by Act No. 4514, Dec. 8, 1992; Act No. 4860, Jan. 5, 1995; Act No. 5234, Dec. 30, 1996; Act No. 7107, Jan. 20, 2004>
법령보기 화면
Article 30-2 (Fine for Negligence)
(1)
Any person who falls under any of the following subparagraphs shall be punished by a fine for negligence not exceeding thirty million won:
<Amended by Act No. 4860, Jan. 5, 1995; Act No. 5234, Dec. 30, 1996; Act No. 7107, Jan. 20, 2004>
1.
A person who fails to attend without any justifiable reason, in violation of the provisions of
Article 50
(Inquiries, etc. of Violations) (1) 1 of the
Monopoly Regulation and Fair Trade Act
, which is applicable
mutatis mutandis
under
Article 27
(Mutatis Mutandis Application of
Monopoly Regulation and Fair Trade Act
) (2);
2.
A person who fails to make a report, or to submit necessary materials or things as prescribed in
Article 50
(Investigation, etc. of Violations) (1) 3 or (3) of the
Monopoly Regulation and Fair Trade Act
, which is applicable
mutatis mutandis
under
Article 27
(Mutatis Mutandis Application of
Monopoly Regulation and Fair Trade Act
) (2), or who makes a false report, or submits false materials or things; and
3.
A person who refuses, interferes with, or evades, any inspection as prescribed in
Article 50
(Investigation, etc. of Violations) (2) of the
Monopoly Regulation and Fair Trade Act
, which is applicable
mutatis mutandis
under
Article 27
(Mutatis Mutandis Application of
Monopoly Regulation and Fair Trade Act
) (2).
(2)
Any one who fails to comply with the instruction to maintain a good order, thereby violating the provisions of
Article 43-2
(Maintenance of Good Order in the Court Room) of the
Monopoly Regulation and Fair Trade Act
which are applicable
mutatis mutandis
under
Article 27
(Mutatis Mutandis Application of the
Monopoly Regulation and Fair Trade Act
) (1), shall be punished by a fine for negligence not exceeding one million won.
<Newly Inserted by Act No. 5234, Dec. 30, 1996>
(3)
The fine for negligence as referred to in paragraphs (1) and (2) of this Article shall be imposed and collected by the Fair Trade Commission under the provisions of the Presidential Decree.
<Amended by Act No. 5234, Dec. 30, 1996>
(4)
Any person who is not satisfied with a disposition of a fine for negligence as referred to in paragraph (3) of this Article may make an objection against the Fair Trade Commission within thirty days after he is informed of such disposition.
<Amended by Act No. 5234, Dec. 30, 1996>
(5)
If a person who is subject to a disposition of a fine for negligence as referred to in paragraph (3) of this Article, makes an objection under paragraph (4) of this Article, the Fair Trade Commission shall notify the competent court thereof without delay, which shall, upon receiving the notification, bring the case of the fine for negligence to a trial under the
Non-Contentious Case Litigation Procedure Act
.
<Amended by Act No. 5234, Dec. 30, 1996>
(6)
If no objection is made, and no fine for negligence is paid within the period as referred to in paragraph (4) of this Article, it shall be collected according to the examples of a disposition of national tax in arrears.
<Amended by Act No. 5234, Dec. 30, 1996>
[This Article Newly Inserted by Act No. 4514, Dec. 8, 1992]
법령보기 화면
Article 31 (Joint Penal Provisions)
If a representative of a juristic person, or an agent, serviceman or other employee of a juristic person or an individual commits an offense falling under
Article 30
(Penal Provisions) in connection with the affairs of the juristic person or the individual, the fine as prescribed in the respective paragraphs of
Article 30
shall also be imposed on such juristic person or individual, in addition to the punishment of the offender.
<Amended by Act No. 5234, Dec. 30, 1996>
법령보기 화면
Article 32 (Complaint)
An indictment against a crime as prescribed in
Article 30
may be made only under a complaint of the Fair Trade Commission.
<Amended by Act No. 5234, Dec. 30, 1996>
[This Article Wholly Amended by Act No. 4514, Dec. 8, 1992]
법령보기 화면
Article 33 (Both to Blame Provisions)
If a subcontractor is liable for any offense committed by a prime contractor against this Act, this may be taken into consideration when taking corrective measures, filing the complaint, or applying the penal provisions under this Act.
법령보기 화면
Article 34 (Relation with Other Acts)
If the provisions of the
Act on the Protection of the Business Sphere of Small and Medium Enterprises and Promotion of Their Cooperation
, the
Electrical Construction Business Act
, the
Framework Act on the Construction Industry
, and the
Information and Communication Work Business Act
are contrary to this Act, such provisions shall be governed by this Act.
<Amended by Act No. 4898, Jan. 5, 1995; Act No. 5386, Aug. 28, 1997; Act No. 5454, Dec. 13, 1997>
법령보기 화면
Article 35 (Enforcement Decree)
Matters necessary for enforcing this Act shall be prescribed by the Presidential Decree.
ADDENDUM
This Act shall enter into force three months after the date of its promulgation.
ADDENDA<Act No. 4198, Jan. 13, 1990>
Article 1 (Enforcement Date)
This Act shall enter into force on April 1, 1990.
Articles 2 through 5 Omitted.
ADDENDA<Act No. 4419, Dec. 14, 1991>
Article 1 (Enforcement Date)
This Act shall enter into force on July 1, 1992. (Proviso Omitted.)
Articles 2 through 8 Omitted.
ADDENDA<Act No. 4514, Dec. 8, 1992>
(1)
(Enforcement Date) This Act shall enter into force on April 1, 1993.
(2)
(Transitional Measures) The amended provisions of
Articles 6
,
7
,
13
and
15
shall not apply to any subcontract already concluded at the time this Act enters into force.
(3)
Omitted.
ADDENDA<Act No. 4860, Jan. 5, 1995>
(1)
(Enforcement Date) This Act shall enter into force on April 1, 1995.
(2)
(Transitional Measures) Notwithstanding the revised provisions of
Articles 2
,
13
(4) and
16
(2), any subcontract already concluded at the time this Act enters into force shall be governed by the previous provisions.
ADDENDA<Act No. 4898, Jan. 5, 1995>
Article 1 (Enforcement Date)
This Act shall enter into force on July 1, 1995.
Articles 2 through 11 Omitted.
ADDENDA<Act No. 5234, Dec. 30, 1996>
(1)
(Enforcement Date) This Act shall enter into force on April 1, 1997.
(2)
(Transitional Measures for Subcontract Transactions under Conclusion of Subcontracts) If a subcontract was already concluded at the time this Act entered into force, the former provisions of this Act shall apply notwithstanding the amended provisions of
Articles 13-2
(Guarantee for Performance of Construction Subcontracts and for Payment of Price) and
25-3
(Penalty).
ADDENDA<Act No. 5386, Aug. 28, 1997>
Article 1 (Enforcement Date)
This Act shall enter into force on January 1, 1998. (Proviso Omitted.)
Articles 2 through 8 Omitted.
ADDENDUM<Act No. 5454, Dec. 13, 1997>
This Act shall enter into force on January 1, 1998. (Proviso Omitted.)
ADDENDA<Act No. 5507, Jan. 13, 1998>
Article 1 (Enforcement Date)
This Act shall enter into force on the date of its promulgation.
Article 2 Omitted.
ADDENDA<Act No. 5756, Feb. 5, 1999>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation. (Proviso Omitted.)
Articles 2 through 7 Omitted.
ADDENDA<Act No. 5816, Feb. 5, 1999>
(1)
(Enforcement Date) This Act shall enter into force on April 1, 1999.
(2)
(Transitional Measures concerning Subcontract Transaction under Conclusion of Subcontract) Notwithstanding the amended provisions of
Article 13
, the previous provisions shall apply to a subcontract transaction for which a subcontract has already been concluded at the time when this Act enters into force.
ADDENDA<Act No. 6198, Jan. 21, 2000>
Article 1 (Enforcement Date)
This Act shall enter into force six months after the date of its promulgation.
Articles 2 through 7 Omitted.
ADDENDA<Act No. 6893, May 29, 2003>
Article 1 (Enforcement Date)
This Act shall enter into force one year after the date of its promulgation.
Articles 2 through 6 Omitted.
ADDENDA<Act No. 7107, Jan. 20, 2004>
(1)
(Enforcement Date) This Act shall enter into force three months after the date of its promulgation.
(2)
(Application Example concerning Penal Provisions) The amended provisions of
Article 30
(1) 3-2 shall apply to the portion of subcontract to be concluded first after the enforcement of this Act.
ADDENDA<Act No. 7315, Dec. 31, 2004>
Article 1 (Enforcement Date)
This Act shall enter into force on April 1, 2005. (Proviso Omitted.)
Articles 2 through 10 Omitted.
ADDENDA<Act No. 7488, Mar. 31, 2005>
(1)
(Enforcement Date) This Act shall enter into force three months after the date of its promulgation.
(2)
(Application Example concerning Subcontract Transaction of Service Entrustment) The amended provisions of
Article 2
(1) and (11) shall apply starting from the portion of a subcontract transaction for which the contract for subcontract of service entrustment is concluded first after the enforcement of this Act.
(3)
(Application Example concerning Additional Payment for Refund of Surcharge) The amended provisions of
Article 25-3
(2) shall apply starting from the penalty to be refunded first after the enforcement of this Act.
(4)
(Transitional Measures concerning Subcontract Transaction for which Contract for Subcontract has been Concluded) The previous provisions shall govern the subcontract transaction for which a contract for subcontract has already been concluded at the time of enforcement of this Act, notwithstanding the amended provisions of
Article 2
(1), (11),
Article 12-2
and
Article 13-2
(5).
Last updated : 2009-07-26